Contact Us
NATIONAL SALES HOTLINE:13585011595
0510-85503992
0510-85503992
Tel:0510-85503992
Fax:0510-85503992
Sales hotline:13585011595
Contacts:Zhou jian xing
E-mail: 13585011595@163.com
sales@sencanjixie.com
Add:Qinxin industrial Fields,Binhu Dist,Wuxi City,Jiang su
Horizontal steel lined plastic storage tank also has certain precautions and technical operation during installation. If you don't know about it, you may not know how to install it correctly. Let's give you a good explanation.
1. Before the installation of steel lined plastic tank, the tank foundation shall be subject to settlement test to ensure the stability of the foundation and no displacement of the tank body.
2. If the tank is installed on two saddle supports, one of the supports shall be fixed end and the other shall be movable end, so that the tank can expand and contract freely. The liquid phase pipe on the tank should be installed close to the fixed end.
3. The installation position of the tank body shall be inclined downward to the end with liquid phase pipe, with a gradient of 0.01-0.02, and a drain valve shall be set at the lowest part of the tank body.
4. The control valve of the spray device shall be far away from the storage tank, so as to ensure that the valve can be opened in time to spray water in case of fire that cannot enter the tank area.
5. The blowdown pipe should be set uniformly and centrally, and the drainage height should not be less than 5m. The upper end of the blowdown pipe should be equipped with elbow or rain cap to avoid water in the pipe.
After reading the introduction to the installation of horizontal steel lined plastic storage tank, I believe that you can help to avoid unnecessary losses and accidents when you need to install it. For more information, please call us at any time!